****ALERTS**** > Front Walkway Restoration (update)
Front Walkway Restoration (update)
Aug 19, 2011 --

Please be aware contractor work has begun 6/27/11 on restoring the front walkway/steps and is likely to continue for several weeks.  Please be careful when walking in the walkway and use exit door if necessary.  Thank you. 

Update 7/23/11:

The steel beam that supports the top stairs needs to be replaced as it is corroded beyond repair.  This, along with the excessive heat, has extended the project several more weeks.  According to the contractor, the cement is going to be poured once the excessive heat lets up.  You will need to use the rear exit door during this time.  The steel beam is also being replaced in next several weeks.

 

Update 8/19/11:

All work is scheduled to be completed by 8/26/11 weather permitting.